[{"data":1,"prerenderedAt":56},["ShallowReactive",2],{"update-updates_en-2026-11-08-listas-de-casillas-en-etapas":3},{"id":4,"title":5,"body":6,"date":30,"description":31,"extension":32,"media":33,"meta":34,"navigation":35,"panel_path":36,"panel_roles":37,"panel_steps":41,"panel_summary":45,"panel_title":46,"panel_where":47,"partners":48,"path":49,"rawbody":50,"release":33,"seo":51,"stem":52,"tags":53,"__hash__":55},"updates_en\u002Fnovedades\u002F2026-11-08-listas-de-casillas-en-etapas.md","Checklists on every stage now show up and can be completed",{"type":7,"value":8,"toc":24},"minimark",[9,14],[10,11,13],"h2",{"id":12},"nothing-stays-hidden","Nothing stays hidden",[15,16,17,21],"ul",{},[18,19,20],"li",{},"The exit and work checks a workshop sets up as a list can be completed from the phone, with large, easy-to-tap boxes.",[18,22,23],{},"If something is still unticked, you see how much is left before handing over the vehicle.",{"title":25,"searchDepth":26,"depth":27,"links":28},"",2,3,[29],{"id":12,"depth":26,"text":13},"2026-11-08","Checklists like the exit inspection or the work done are ticked on the task and kept in the history.","md",null,{},true,"\u002Ftasks\u002Flist",[38,39,40],"owner","manager","staff",[42,43,44],"Open a task and go to the stage with the list.","Tick the boxes; if one is missing, the notice says «2 of 4 still to check» and takes you to the field.","Confirm the stage: what you ticked stays in the history.","List items (for example «Vistoria de saída») now show one checkbox per option. When required, every box must be ticked and the notice says how many are left.","Checklists on a stage","Work → Task → Stage",false,"\u002Fnovedades\u002F2026-11-08-listas-de-casillas-en-etapas","---\ndate: \"2026-11-08\"\ntitle: \"Checklists on every stage now show up and can be completed\"\ndescription: \"Checklists like the exit inspection or the work done are ticked on the task and kept in the history.\"\ntags: [fixed]\npanel_title: \"Checklists on a stage\"\npanel_summary: \"List items (for example «Vistoria de saída») now show one checkbox per option. When required, every box must be ticked and the notice says how many are left.\"\npanel_where: \"Work → Task → Stage\"\npanel_path: \"\u002Ftasks\u002Flist\"\npanel_roles: [owner, manager, staff]\npanel_steps:\n  - \"Open a task and go to the stage with the list.\"\n  - \"Tick the boxes; if one is missing, the notice says «2 of 4 still to check» and takes you to the field.\"\n  - \"Confirm the stage: what you ticked stays in the history.\"\n---\n\n## Nothing stays hidden\n\n- The exit and work checks a workshop sets up as a list can be completed from the phone, with large, easy-to-tap boxes.\n- If something is still unticked, you see how much is left before handing over the vehicle.\n",{"title":5,"description":31},"novedades\u002F2026-11-08-listas-de-casillas-en-etapas",[54],"fixed","6IGKJjmimGUv6_i0kZUtS5t8hdD-es21XOlrCzIlFxM",1795368894448]