[{"data":1,"prerenderedAt":73},["ShallowReactive",2],{"update-updates_en-2026-10-27-wagy-lote":3},{"id":4,"title":5,"body":6,"date":49,"description":50,"extension":51,"media":52,"meta":53,"navigation":54,"panel_path":52,"panel_roles":55,"panel_steps":58,"panel_summary":62,"panel_title":63,"panel_where":64,"partners":65,"path":66,"rawbody":67,"release":52,"seo":68,"stem":69,"tags":70,"__hash__":72},"updates_en\u002Fnovedades\u002F2026-10-27-wagy-lote.md","Your assistant makes several changes at once, and you stay in control",{"type":7,"value":8,"toc":43},"minimark",[9,14],[10,11,13],"h2",{"id":12},"what-you-get","What you get",[15,16,17,25,31,37],"ul",{},[18,19,20,24],"li",{},[21,22,23],"strong",{},"One confirmation:"," review the whole list and approve it at once.",[18,26,27,30],{},[21,28,29],{},"Control at every step:"," each change waits a few seconds before it applies; stop the one you don't want or pause everything.",[18,32,33,36],{},[21,34,35],{},"Nothing gets stuck:"," what doesn't fit is marked for you to decide, and the rest goes on.",[18,38,39,42],{},[21,40,41],{},"Undo per change:"," if something isn't right, roll it back without touching the rest.",{"title":44,"searchDepth":45,"depth":46,"links":47},"",2,3,[48],{"id":12,"depth":45,"text":13},"2026-10-27","Ask it to «reschedule my late tasks»: it builds the list, you confirm once and it applies them one at a time, with time to stop any of them.","md",null,{},true,[56,57],"owner","manager",[59,60,61],"Ask Wagy, for example, «reschedule my late tasks to tomorrow».","Review the list and confirm it once (if nothing reaches the customer, depending on your level, it starts on its own).","While it runs, tap «Stop this one» on a change or «Pause all»; afterwards you can undo each one.","When Wagy proposes several changes together (for example, moving 7 late tasks to tomorrow), you confirm once and it applies them one at a time, each with its own countdown. You can stop one, pause all and resume, and undo each change on its own. The ones that don't fit (no free slot or a conflict) are marked for you to choose what to do, without stopping the rest.","Wagy applies several changes one at a time, with stop and pause","Wagy → plan card",false,"\u002Fnovedades\u002F2026-10-27-wagy-lote","---\ndate: \"2026-10-27\"\ntitle: \"Your assistant makes several changes at once, and you stay in control\"\ndescription: \"Ask it to «reschedule my late tasks»: it builds the list, you confirm once and it applies them one at a time, with time to stop any of them.\"\ntags: [new]\npanel_title: \"Wagy applies several changes one at a time, with stop and pause\"\npanel_summary: \"When Wagy proposes several changes together (for example, moving 7 late tasks to tomorrow), you confirm once and it applies them one at a time, each with its own countdown. You can stop one, pause all and resume, and undo each change on its own. The ones that don't fit (no free slot or a conflict) are marked for you to choose what to do, without stopping the rest.\"\npanel_where: \"Wagy → plan card\"\npanel_roles: [owner, manager]\npanel_steps:\n  - \"Ask Wagy, for example, «reschedule my late tasks to tomorrow».\"\n  - \"Review the list and confirm it once (if nothing reaches the customer, depending on your level, it starts on its own).\"\n  - \"While it runs, tap «Stop this one» on a change or «Pause all»; afterwards you can undo each one.\"\n---\n\n## What you get\n\n- **One confirmation:** review the whole list and approve it at once.\n- **Control at every step:** each change waits a few seconds before it applies; stop the one you don't want or pause everything.\n- **Nothing gets stuck:** what doesn't fit is marked for you to decide, and the rest goes on.\n- **Undo per change:** if something isn't right, roll it back without touching the rest.\n",{"title":5,"description":50},"novedades\u002F2026-10-27-wagy-lote",[71],"new","SkIGFECohJtzle97ggZ_LQ6Hn7M4tN9Z9zvS-sd_teU",1793683967605]